top of page
Search

Turbocharging Your Parts Changeover Process with SMED

Changeover processes can be a real wrench in the works for manufacturing efficiency. Whether you're dealing with an automotive assembly line or a small-scale bakery, downtime during parts changeovers can take a big bite out of productivity. Enter Single Minute Exchange of Die (SMED), a lean manufacturing concept that aims to reduce changeover times and optimize processes.



Imagine a pit stop at a Formula 1 race – every second counts. The same principle applies to your parts changeover process. One way to rev up your efficiency is by strategically positioning changeover parts.

 

Instead of having your workers hunt down components across the factory floor, establish a dedicated location for next-up changeover parts. This not only optimizes travel distance but also prevents the dreaded "Where's that darn widget?" scenario. It's like having a pit crew chief who always knows where the next tire or tool is.


Execute Parallel Performance by emphasizing the value of commencing multiple setup tasks simultaneously. Like a well-oiled machine, each team member plays a specific role in parallel to others, reducing the total time for changeovers and enhancing collaboration.

 

Highlight the shift of certain setup activities from internal (done during machine downtime) to external (performed while the machine is running). This strategy ensures that more preparatory work is completed without impacting production, akin to setting the stage without stopping the show.

 

Now, let's address the elephant in the factory – changeovers are necessary evils, but can we have fewer of them, please? This is where scheduling comes into play, and we'll call it "The Juggling Act".

 

Reducing changeover frequency is like juggling: you want to keep those balls (changeovers) in the air for as long as possible without dropping any. To do this, analyze your production orders and see if you can bundle similar products together. The fewer changeovers you have to perform, the more you save on time and resources.

 

Imagine a bakery that schedules its bread and croissant production back-to-back, as opposed to alternating. Fewer changeovers mean less downtime, more efficient use of equipment, and happier bakers who don't feel like they're doing a circus act.

Now, let's talk tools. Specifically, trading in your old, rusty hand tools for some power-packed counterparts - "From Wrench to Winch".

 

In the world of SMED, every second counts, and hand tools can be time vampires. Consider this: a factory worker manually unscrewing bolts during a changeover versus one wielding a power tool. The latter looks like a character from a superhero movie – fast, efficient, and with an epic soundtrack (okay, maybe not the soundtrack, but you get the point).

 

By adopting power tools, you're not just speeding up the process; you're also reducing the risk of injuries caused by repetitive manual labor. Plus, it's more fun to press a button and see bolts whizzing out than to twist them by hand.

 




In the world of manufacturing, SMED is your trusty sidekick, helping you fight the evil forces of downtime and inefficiency. By strategically positioning changeover parts, optimizing your schedule, and embracing power tools, you can turn your changeover process into a well-choreographed performance.

 

In the end, SMED isn't just about saving time and money; it's about creating a workplace where changeovers are a breeze, and your team can put the pedal to the metal, leaving inefficiency in the dust.


Thanks for reading!



Rick

Sigmasmith


 

 

10 views0 comments
bottom of page